Tempest 2000
No | Name | Yard No | Builder | Laid down | Launched | Comm | Fate |
PC1, 2.2000- WPC1 | Cyclone | Bollinger Machine Shop & SY, Lockport | 22.6.1991 | 1.2.1992 | 7.8.1993 | Coast Guard 2.2000, to Philippines 3.2004 (General Mariano Alvarez) | |
PC2, 9.2005- WPC2, 8.2008- PC2 | Tempest | Bollinger Machine Shop & SY, Lockport | 30.9.1991 | 4.4.1992 | 21.8.1993 | Coast Guard 9.2005-8/2008, in service (2020) | |
PC3 | Hurricane | Bollinger Machine Shop & SY, Lockport | 20.11.1991 | 6.6.1992 | 15.10.1993 | in service (2020) | |
PC4 | Monsoon | Bollinger Machine Shop & SY, Lockport | 15.2.1992 | 10.10.1992 | 22.1.1994 | in service (2020) | |
PC5 | Typhoon | Bollinger Machine Shop & SY, Lockport | 15.5.1992 | 3.3.1993 | 12.2.1994 | in service (2020) | |
PC6 | Sirocco | Bollinger Machine Shop & SY, Lockport | 20.6.1992 | 29.5.1993 | 11.6.1994 | in service (2020) | |
PC7 | Squall | Bollinger Machine Shop & SY, Lockport | 17.2.1993 | 28.8.1993 | 4.7.1994 | in service (2020) | |
PC8, 10.2004- WPC8, 9.2011- PC8 | Zephyr | Bollinger Machine Shop & SY, Lockport | 6.3.1993 | 3.12.1993 | 15.10.1994 | Coast Guard 10.2004-9/2011, in service (2020) | |
PC9 | Chinook | Bollinger Machine Shop & SY, Lockport | 16.6.1993 | 26.2.1994 | 28.1.1995 | in service (2020) | |
PC10 | Firebolt | Bollinger Machine Shop & SY, Lockport | 17.9.1993 | 10.6.1994 | 10.6.1995 | in service (2020) | |
PC11 | Whirlwind | Bollinger Machine Shop & SY, Lockport | 4.3.1994 | 9.9.1994 | 1.7.1995 | in service (2020) | |
PC12 | Thunderbolt | Bollinger Machine Shop & SY, Lockport | 9.6.1994 | 2.12.1994 | 7.10.1995 | in service (2020) | |
PC13, 10.2004- WPC13, 9.2011- PC13 | Shamal | Bollinger Machine Shop & SY, Lockport | 23.9.1994 | 3.3.1995 | 27.1.1996 | Coast Guard 10.2004-9/2011, in service (2020) | |
PC14, 10.2004- WPC14, 9.2011- PC14 | Tornado | Bollinger Machine Shop & SY, Lockport | 25.8.1998 | 7.6.1999 | 24.6.2000 | Coast Guard 10.2004-9/2011, in service (2020) |
Displacement standard, t |
PC1-13: 288 light PC14: 352 light |
Displacement full, t |
PC1-13: 334 PC14: 387 |
Length, m |
PC1-13: 48.0 wl 51.6 oa PC14: 48.0 wl 54.4 oa |
Breadth, m |
7.62 |
Draught, m |
2.44 |
No of shafts |
4 |
Machinery |
4 Paxman Valenta 16V RP-200 CM diesels |
Power, h. p. |
13400 |
Max speed, kts |
35 |
Fuel, t |
diesel oil 40 |
Endurance, nm(kts) |
2500(12) |
Armament |
1 x 1 Stinger SAM (6 FIM-92), 1 x (1 - 25/75 Mk 88 Bushmaster + 1 - 40/17 Mk 19 Mod. 3 grenade launcher) Mk 96 Mod. 1, 1 x 1 - 25/75 Mk 38 Mod. 2, 4 x 2 - 12.7/90, 1 x 1 - 12.7/90, 2 x 1 - 7.6/90, 2 x 1 - 40/17 Mk 19 Mod. 3 grenade launchers |
Military load |
PC1-13: RIB PC14: 9.75m RIB on stern ramp |
Electronic equipment |
PC1-13: Rascar 3400C X-band and S-band radars, Wesmar sonar, APR-39(v)1 ECM suite, 2 Mk 137 decoy RLs (Mk 52 Mod. 0 system), KAX-1 E/O system PC14: Rascar 3400C X-band and S-band radars, Wesmar sonar, APR-39(v)1 ECM suite, 2 Ultrabarricade decoy RLs, KAX-1, Viper E/O systems |
Complement |
28 + 9 SEALs |
Project history: Replacement of the PB Mk III boats, replacing earlier SWCM and PCM projects. Planned programme of 16 units was stopped in 1991 partly because they were too large.
Modernizations: 1999-2000, Tempest, Zephyr, Shamal; 2009-2010, Hurricane, Monsoon, Squall, Whirlwind, Thunderbolt: were lengthened as PC14 and also received stern ramp for RIB.
2016-2017, some: + 1 x 4 Griffin SSM (4 BGM-176B) (temporarily)
Fate notes: No significant events.
Squall 2002
Whirlwind 2002