Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
i | ADSB, Abu Dhabi | 2020 | 2022 | 2024 | ordered (2020) | ||
ii | ADSB, Abu Dhabi | 2020 | 2022 | 2024 | ordered (2020) |
Displacement standard, t |
|
Displacement full, t |
2600 |
Length, m |
102.0 |
Breadth, m |
16.0 |
Draught, m |
5.40 |
No of shafts |
2 |
Machinery |
4 diesels-generators, 2 electric motors |
Power, h. p. |
13600 |
Max speed, kts |
25 |
Fuel, t |
diesel oil |
Endurance, nm(kts) | 3700(15) |
Armament |
2 x 4 MM40 Exocet Block III SSM (8 MM40), 1 x 16 ESSM SAM (VLS, 16 RIM-162), 1 x 1 - 76/62 OTO-Melara Compact SR, 2 x 1 - 20/90 Narwhal-20B, 2 x 3 - 324 TT, 1 helicopter |
Electronic equipment |
SMART-S Mk 2, nav. radars, Kingclip, CAPTAS UMS-4249 sonars, Vigile, Altesse ECM suites, SETIS CCS |
Complement |
65 + 15 passengers |
Project history: French Naval Group Gowind 2500 design, officially rated as corvette. Contract was signed 25.3.2019. Building of two ships was ordered with option for two more ships.
Modernizations: None.
Naval service: No significant events.
© Ivan Gogin, 2020