Anıttepe 1990
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Alçıtepe (ex-Robert A. Owens) | D346 | Bath Iron Wks, USA | 29.10.1945 | 15.7.1946 | 5.11.1949 // 16.2.1982 | stricken 4.1998 | |
Anıttepe (ex-Carpenter) | D347 | Consolidated, Orange, USA | 30.7.1945 | 30.12.1945 | 15.12.1949 // 20.2.1981 | stricken 11.1997 |
Displacement standard, t |
2425 |
Displacement full, t |
3540 |
Length, m |
119.0 |
Breadth, m |
12.5 |
Draught, m |
4.61 full load 6.40 over sonar |
No of shafts |
2 |
Machinery |
2 sets General Electric geared steam turbines, 4 Babcock & Wilcox boilers |
Power, h. p. |
60000 |
Max speed, kts |
34 |
Fuel, t |
oil 720 |
Endurance, nm(kts) | 5800(12) |
Armament |
1 x 8 ASROC ASuR (14 RUR-5), 1 x 2 - 127/38 Mk 38, 2 x 3 - 324 Mk 32 TT, helicopter deck |
Electronic equipment |
2x SPS-10, SPS-40, Mk 35 radars, SQS-23 sonar, WLR-1 ECM suite |
Complement |
274 |
Project history: Former USN Carpenter-class (specialized ASW version of the Gearing class), received FRAM I modernization in 1962. Both can handle AB.212 helicopter but hangar was too small to accept it.
Modernizations: early 1980s, both: + 1 x 2 - 76/50 Mk 33, 1 x 2 - 35/90 GDM-A, 1 DCR, 4x RBOC decoy RL, T-Mk 6 Fanfare torpedo decoy
early 1990s, Anıttepe: - WLR-1 ECM suite; + Cutlass B1 ECM suite
Naval service: No significant events.
Anıttepe 1984
© Ivan Gogin, 2018