similar Chinese Changcheng 330 2010
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
i | Wuchang, Wuhan, China | 2019 | 2021 | 2023 | building (2019) |
Displacement standard, t |
|
Displacement normal, t |
2725 / 3600 |
Length, m |
77.6 |
Breadth, m |
8.40 hull |
Draught, m |
5.50 |
No of shafts |
1 |
Machinery |
4 MTU 16V396 SE84 diesel-generators / Stirling AIP, 1 electric motor |
Power, h. p. |
6092 / 220 |
Max speed, kts |
16 / 23 |
Fuel, t |
diesel oil |
Endurance, nm(kts) |
8000(16) / 800(4) |
Armament |
6 - 533 TT (bow, 18, inc. Yin Ji-82 SSM (4 C-602) or 24-36 mines) |
Electronic equipment |
type 359 radar, H/SQG-4 sonar suite (TSM2233 Eledone, TSM-2255, SQB-2 sonars), H/SQC-207 sonar, Type 921-A (SRW209) ECM suite, CCS |
Complement |
58 |
Diving depth operational, m |
300 |
Project history: Chinese export design S26 was chosen by Thai Navy in 2015 and an order for the first submarine of the batch of three was signed in May 2017.
Modernizations: None.
Naval service: No significant events.
© Ivan Gogin, 2019