MS-520 small submarines (project 865) (1988 - 1990)
MS-520 1990
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
جر-520 [MS-520] | 01465 | Admiralty Yd, Leningrad | 15.7.1984 | 20.8.1986 | 30.12.1988 | stricken 7.1996 | |
جر-521 [MS-521] | 01466 | Admiralty Yd, Leningrad | 1.12.1987 | 31.5.1990 | 25.12.1990 | stricken 7.1996 | |
جر-518 [MS-518] | 01468 | Admiralty Yd, Leningrad | 1988 | --- | --- | cancelled 1.1991 |
Displacement standard, t |
|
Displacement normal, t |
218 / 387 |
Length, m |
28.2 |
Breadth, m |
4.74 |
Draught, m |
3.90 |
No of shafts |
1 |
Machinery |
1 diesel-generator, 1 electric motor |
Power, h. p. |
217 / 82 |
Max speed, kts |
6.3 / 6.5 |
Fuel, t |
diesel oil |
Endurance, nm(kts) |
600(4) / 260(4) |
Armament |
2 - 400 TT (2) or 4 mines |
Military load | 6 combat swimmers, 4 Proton submerged tugs or 2 Sirena-U manned transporters |
Electronic equipment |
radar, sonar, ECM suite |
Complement |
3 |
Diving depth operational, m |
180 |
Project history: Project 865 was established in 1973 for delivering of saboteurs to enemy coast. Design by TsKB-16 (Malakhit). Apparently they were not successful. They were stricken after less than 10-year service due to many problems during their sea voyages. They were double-hulled, hulls were built from Titanium alloy. Saboteur can leave submerged submarine through the lock chamber on 60m deep.
Modernizations: None.
Naval service: No significant events.
© Ivan Gogin, 2016