K-525 nuclear powered cruise missile submarines (project 949) (1980 - 1983)
K-206 1990
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
К-525 [K-525], 4.1993- К-525 Архангельск [K-525 Arkhangelsk] | 605 | Northern Yd, Severodvinsk | 25.7.1975 | 3.5.1980 | 30.12.1980 | stricken 7.1996 | |
К-206 [K-206], 4.1987- К-206 Минский комсомолец [K-206 Minskiy Komsomolets], 2.1992- К-206 [K-206], 4.1993- К-206 Мурманск [K-206 Murmansk] | 606 | Northern Yd, Severodvinsk | 22.4.1979 | 10.12.1982 | 30.11.1983 | stricken 1.1998 |
Displacement standard, t |
|
Displacement normal, t |
12500 / 16500 |
Length, m |
143.0 |
Breadth, m |
18.2 hull 22.0 max |
Draught, m |
9.00 |
No of shafts |
2 |
Machinery |
2 OK-9DM geared steam turbines sets, 2 OK-650M.01 nuclear reactors |
Power, h. p. |
100000 |
Max speed, kts |
16 / 32 |
Fuel, t |
nuclear |
Endurance, nm(kts) |
practically unlimited |
Armament |
24 x 1 Granit SSM (24 P-50 (3M45)), 2 - 650 TT (10, inc. URPK-7 Veter SSM/ASuM (86R, 88R)), 4 - 533 TT (18, inc. URPK-6 Vodopad-PL SSM/ASuM (83R, 84R), Shkval rocket torpedoes) |
Electronic equipment |
MRK-55 Chibis radar, MGK-500 Skat-KS sonar suite, MG-519M Arfa-M, MG-512 Vint-M sonars, Bukhta ECM suite, Antey CCS, Korall satellite-based targeting system |
Complement |
94 |
Diving depth operational, m |
420 |
Project history: These are, In effect, successors to Project 675, capable of launching the next-generation Granit missile while submerged. They were originally to have worked on the basis of US-A and US-P radar satellite data (transmitted through the Korall system antenna in their sails), but this satellite system, Legenda is now gradually collapsing. They can also obtain targeting information via a towed VLF buoy housed abaft the sail. The missiles are in tubes canted 40 degrees to the vertical, one door covering each pair. As in Projects 661 and 670, the missiles occupy the space between tye inner and outer hulls; inner hull volume must be somewhat limited (standoff is about 3.5m); reported pressure hull diameter is 8.5m. The torpedo room forward may therefore not have much greater capacity than that of a Project 671RTM.
Only two submarines were built under the Project 949, all others were laid down under modified Project 949A with one additional compartment.
Modernizations: None.
Naval service: No significant events.
© Ivan Gogin, 2016