B.1
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Á.1 [B.1] | Baltic Wks, Petrograd | 1917 | --- | --- | suspended 1918 | ||
Á.2 [B.2] | Baltic Wks, Petrograd | 1917 | --- | --- | suspended 1918 | ||
Á.3 [B.3] | Baltic Wks, Petrograd | 1917 | --- | --- | suspended 1918 | ||
Á.4 [B.4] | Baltic Wks, Petrograd | 1917 | --- | --- | suspended 1918 |
Displacement standard, t |
|
Displacement normal, t |
971 / 1264 |
Length, m |
80.5 |
Breadth, m |
7.00 |
Draught, m |
4.00 |
No of shafts |
2 |
Machinery |
2 diesels / 2 electric motors |
Power, h. p. |
2640 / 740 |
Max speed, kts |
17 / 9 |
Fuel, t |
diesel oil |
Endurance, nm(kts) | 3000(10) / 100(5) |
Armament |
2 x 1 - 102/33 Obukhov, 1 x 1 - 57/50 Hotchkiss, 16 - 450 TT (4 bow, 2 stern, 4 beam, 6 ext drop-collars, 20) |
Complement |
49 |
Diving depth operational, m | 45 |
Project history: Part of the 1916 Submarine Programme, designated for the Baltic Fleet. Bubnov design, influenced by the Holland ones and therefore included such innovations as a double hull and subdivision into 8 watertight compartments. Four of her TT were transversally sited. Ordered 1916, construction begun 1916-17 but abandoned after the Bolshevik Revolution.
© Ivan Gogin, 2014