MDK-86 small landing ships (air cushion) (project 12321) (1974 - 1985)
MDK-86 1975
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Project 1232 | |||||||
ÌÄÊ-167 [MDK-167] | 71 | Almaz, Leningrad | 1967 | 12.1970 | TS 1975, stricken 1992 | ||
Project 12321 | |||||||
ÌÄÊ-86 [MDK-86] | 72 | Almaz, Leningrad | 21.1.1975 | stricken 1988 | |||
ÌÄÊ-117 [MDK-117] | 73 | Almaz, Leningrad | 15.7.1974 | stricken 6.1991 | |||
ÌÄÊ-103 [MDK-103] | 74 | Almaz, Leningrad | 27.1.1976 | stricken 3.1992 | |||
ÌÄÊ-217 [MDK-217] | 75 | Almaz, Leningrad | 30.9.1976 | stricken 3.1992 | |||
ÌÄÊ-219 [MDK-219] | 76 | Almaz, Leningrad | 22.10.1977 | stricken 3.1992 | |||
ÌÄÊ-184 [MDK-184] | 77 | Almaz, Leningrad | 30.7.1978 | stricken 5.2004 | |||
ÌÄÊ-162 [MDK-162] | 78 | Almaz, Leningrad | 9.9.1979 | stricken 7.1996 | |||
ÌÄÊ-165 [MDK-165] | 79 | Almaz, Leningrad | 27.5.1980 | stricken 8.1995 | |||
ÌÄÊ-9 [MDK-9] | 80 | Almaz, Leningrad | 1980 | stricken 12.1995 | |||
ÌÄÊ-16 [MDK-16] | 81 | Almaz, Leningrad | 1981 | stricken 12.1995 | |||
ÌÄÊ-88 [MDK-88] | 82 | Almaz, Leningrad | 1981 | stricken 3.2010 | |||
ÌÄÊ-89 [MDK-89] | 83 | Almaz, Leningrad | 30.7.1982 | stricken 7.1996 | |||
ÌÄÊ-77 [MDK-77] | 84 | Almaz, Leningrad | 30.11.1982 | stricken 12.1994 | |||
ÌÄÊ-113 [MDK-113] | 85 | Almaz, Leningrad | 29.8.1983 | stricken 4.2002 | |||
ÌÄÊ-114 [MDK-114] | 86 | Almaz, Leningrad | 21.12.1983 | stricken 3.1998 | |||
ÌÄÊ-15 [MDK-15] | 87 | Almaz, Leningrad | 30.8.1984 | stricken 4.2002 | |||
ÌÄÊ-18 [MDK-18] | 88 | Almaz, Leningrad | 30.11.1984 | stricken 3.2007 | |||
ÌÄÊ-17 [MDK-17] | 89 | Almaz, Leningrad | 30.10.1985 | stricken 4.2002 | |||
ÌÄÊ-44 [MDK-44] | 90 | Almaz, Leningrad | 31.12.1985 | stricken 12.1994 |
Displacement standard, t |
310 |
Displacement normal, t |
pr. 1232: 350 pr. 12321: 360 |
Length, m |
pr. 1232: 45.8 pr. 12321: 45.5 |
Breadth, m |
17.4 |
Draught, m |
1.60 / 0 |
No of shafts |
4 air propellers |
Machinery |
2 NK-12 gas turbines (lift and propulsoion) |
Power, h. p. |
32000 |
Max speed, kts |
pr. 1232: 50 pr. 12321: 49 |
Fuel, t |
gas turbine oil |
Endurance, nm(kts) |
300(49) |
Armament |
pr. 1232: 1 x 2 - 30/71 AK-230 pr. 12321: 2 x 2 - 30/71 AK-230 |
Military load |
2 main battle tanks or 4 light tanks or 5 APC or 80 troops or 73 t of cargo |
Electronic equipment |
pr. 1232: Donets-2 radar pr. 12321: MR-104 Rys', Mius radars |
Complement |
21 |
Project history: Functional successors of Project 106K landing craft. Similar to British SR.N4, with bow and stern doors. Largest such craft in the world when completed.
Modernizations: None.
Naval service: No significant events.
Project 12321 1977
© Ivan Gogin, 2015-18