DERZKIY corvette (project 20386)
Derzkiy
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Меркурий [Merkuriy] (ex-Дерзкий [Derzkiy]) | 1009 | Severnaya verf', St. Petersburg | 28.10.2016 | 2021 | 2022 | building (2019) | |
Способный [Sposobnyy] | 1010 | Severnaya verf', St. Petersburg | 2019 | 2022 | 2023 | ordered (2019) |
Displacement standard, t |
3000 |
Displacement full, t |
3400 |
Length, m |
109.0 |
Breadth, m |
15.0 |
Draught, m |
4.30 hull |
No of shafts |
2 |
Machinery |
CODLAG: 4 diesel-generators, 2 electric motors / 2 M90FR gas turbines |
Power, h. p. |
4400 / 55000 |
Max speed, kts |
30 |
Fuel, t |
diesel oil / gas turbine oil |
Endurance, nm(kts) |
5000(14) |
Armament |
2 x 4 Kalibr-NK SSM/CruM (8 3M14/3M54), 2 x 8 Redut SAM (VLS, 16 9M96 or 64 9M100), 1 x 1 - 100/59 A-190-01, 2 x 6 - 30/54 AK-630M-06, 2 x 4 - 330 Paket-NK TT, 1 helicopter (Ka-27) |
Sensors |
Zaslon, 2x Sandal-V, MR-231-3, Pal-N, MR-123-03 radars, Sfera-05, 2x MTK-201M E/O detectors, Zaria-2, Minotavr-ISPN-M, MG-757 Anapa-M sonars, TK-25-2 ECM suite, 8x KT-216 decoy launchers (Prosvet-M system), Sigma-20380 CCS |
Complement |
80 |
Project history: Fundamentally new design, with balanced composition of weapons, integrated information management system with open architecture, the new radar equipment and robotic systems reducing the crew size. Design is based on the modularity principle: depending on the situation ship can carry additional equipment in container-shape modules. Thanks to innovative technologies, applied in the design of ship, hull was produced by vacuum infusion of composite materials. Ship will have large under-deck hangar and innovative power plant, life support systems, environmental protection and many others features.
Modernizations: None.
Naval service: None.
© Ivan Gogin, 2017-19