Ula 1990
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Ula | S300 | Thyssen Nordseewerke, Emden, West Germany | 29.1.1987 | 28.7.1988 | 27.4.1989 | in service (2019) | |
Utsira | S301 | Thyssen Nordseewerke, Emden, Germany | 15.6.1990 | 21.11.1991 | 30.4.1992 | in service (2019) | |
Utstein | S302 | Thyssen Nordseewerke, Emden, Germany | 6.12.1989 | 25.4.1991 | 14.11.1991 | in service (2019) | |
Utvær | S303 | Thyssen Nordseewerke, Emden, West Germany | 8.12.1988 | 19.4.1990 | 8.11.1990 | in service (2019) | |
Uthaug | S304 | Thyssen Nordseewerke, Emden, West Germany | 15.6.1989 | 18.10.1990 | 7.5.1991 | in service (2019) | |
Uredd | S305 | Thyssen Nordseewerke, Emden, West Germany | 23.6.1988 | 22.9.1989 | 3.5.1990 | in service (2019) |
Displacement standard, t |
940 |
Displacement normal, t |
1040 / 1150 |
Length, m |
59.5 |
Breadth, m |
5.30 |
Draught, m |
4.60 |
No of shafts |
1 |
Machinery |
2 MTU 16V642 MB83 diesel-generators, 1 Siemens electric motor |
Power, h. p. |
6000 |
Max speed, kts |
11 / 23 |
Fuel, t |
diesel oil 100 |
Endurance, nm(kts) | 5000(8) snorkel / |
Armament |
8 - 533 TT (bow, 14 DM-2A3 Seehake) |
Electronic equipment | type 1107 radar, DBQS-21F (CSU-83) sonar suite, Sealion ECM suite, MSI-90U CCS |
Complement |
20 |
Diving depth operational, m | 250 |
Project history: Ordered 30.9.1982 under German Type 210. Hulls of Utsira and Uredd were built by Kvaerner at Oslo and towed for assembling to Emden.
Modernizations: 2008-2015, all: - Sealion ECM suite, MSI-90U CCS; + LOFAR towed sonar array, CS-3701 ECM suite, MSI-90U Mk 2 CCS
Naval service: Uthaug collided with uncharted rock in submerged position 2.12.1994, grounded but returned to port at the same day.
Utstein 2014
© Ivan Gogin, 2019