Mahar Bandula 2015
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
မဟာဗန္ဓုလ [Mahar Bandula] (ex-安顺 [Anshun]) | F21 | Huangpu SY, Guangzhou, China | 10.3.1986 | 27.6.1986 // 8.3.2012 | in service (2019) | ||
မဟာသီဟသူရ [Mahar Thiha Thura] (ex-吉首 [Jishou]) | F23 | Huangpu SY, Guangzhou, China | 8.11.1987 | 15.6.1988 // 8.3.2012 | in service (2019) |
Displacement standard, t |
1425 |
Displacement full, t |
1702 |
Length, m |
103.2 |
Breadth, m |
10.2 |
Draught, m |
3.05 hull |
No of shafts |
2 |
Machinery |
2 SEMT-Pielstick 12PA6 280BTC diesels |
Power, h. p. |
16000 |
Max speed, kts |
25.5 |
Fuel, t |
diesel oil |
Endurance, nm(kts) |
3000(18) |
Armament |
2 x 2 Hai Ying-2A SSM (4 C-201A), 2 x 2 - 100/56 type 79, 4 x 2 - 37/63 type 76, 2 x 5 type 81 ASWRL, 2 DCT, 2 DCR, 60 mines |
Sensors |
2x type 756, type 354, type 517, type 352C, type 343, type 347G radars, OFD-630 e/o system, SJD-5, SJC-1B sonars, 2x type 923-1 ECM suites, 2x Mk 33 RBOC decoy RL, ZKJ-3 CCS |
Complement |
175 |
Project history: Chinese Project 053H1 frigates, transferred after service under Chinese flag.
Modernizations: 2012, both: - 2 x 2 Hai Ying-2A SSM; + 2 x 4 C-802 SSM (8 C-802)
Naval service: No significant events.
Mahar Bandula 2013
© Ivan Gogin, 2019