
Sultn Moulay Ismail 2015
| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
| سلطان مولاي إسماعيل [Sultan Moulay Ismail] | 614 | Schelde SB, Vlissingen, Netherlands | 24.3.2009 | 2.2.2011 | 22.3.2012 | in service (2019) | |
| علال بن عبدلله [Allal Ben Abdelah] | 615 | Schelde SB, Vlissingen, Netherlands | 9/2009 | 8/2011 | 8.9.2012 | in service (2019) |
|
Displacement standard, t |
|
|
Displacement full, t |
2075 |
|
Length, m |
90.7 pp 97.9 oa |
|
Breadth, m |
13.0 |
|
Draught, m |
4.00 |
|
No of shafts |
2 |
|
Machinery |
2 MAN-Pielstick 20PA6BSTC diesels |
|
Power, h. p. |
22030 |
|
Max speed, kts |
28 |
|
Fuel, t |
diesel oil |
| Endurance, nm(kts) | 4000(18) |
|
Armament |
2 x 2 MM40 Exocet Block III SSM (4 MM40 Block III), 1 x 12 MICA SAM (VLS, 12 MICA), 1 x 1 - 76/62 OTO-Melara Compact SR, 2 x 1 - 20/90 F-15B, 2 x 3 -324 B-515 TT (6 MU-90), 1 helicopter (Panther AS-565) |
|
Electronic equipment |
SMART-S Mk 2, 3x Sperry BridgeMaster E, LIROD Mk 2 radars, Kingklip sonar, Vigile 100, Scorpion ECM suites, 2x SKWS decoy RL, TACTICOS CCS |
|
Complement |
91 |
Project history: Dutch SIGMA 9813 design (Ship Integrated Geometrical Modularity Approach), ordered in 2008.
Modernizations: None.
Naval service: No significant events.

Sultan Moulay Ismael 2013
© Ivan Gogin, 2019