Jebat 2010
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Jebat | 29 | GEC-Yarrow SB, Scotstoun, UK | 11/1994 | 27.5.1995 | 18.11.1999 | in service (2019) | |
Lekiu | 30 | GEC-Yarrow SB, Scotstoun, UK | 3/1994 | 3.12.1994 | 9.10.1999 | in service (2019) |
Displacement standard, t |
1845 |
Displacement full, t |
2390 |
Length, m |
97.5 pp 105.5 oa |
Breadth, m |
12.8 |
Draught, m |
3.80 hull |
No of shafts |
2 |
Machinery |
4 MTU 20V1163 TB93 diesels |
Power, h. p. |
33200 |
Max speed, kts |
28.5 |
Fuel, t |
diesel oil |
Endurance, nm(kts) |
5000(14) |
Armament |
2 x 4 MM40 Exocet Block II SSM (8 MM40 Block II), 1 x 16 Sea Wolf GWS26 Mod.1 SAM (VLS, 16 Sea Wolf), 1 x 1 - 57/70 SAK-57 Mk 2, 2 x 1 - 30/75 DS-30B, 2 x 1 - 12.7/90, 2 x 3 - 324 ILAS-3 TT (6 A244/S), 1 helicopter (Fennec) |
Electronic equipment |
Decca nav., Sea Giraffe 150HC, DA-08, 2x type 1802 radars, Radamec 2400, V3901 e/o systems, Spherion sonar, Mentor-2(v)1, Scimitar ECM suites, 2x SuperBarricade decoy RL, Sea Siren torpedo decoy, Nautis-F CCS |
Complement |
146 |
Project history: F2000 design, ordered in 1992. Planned to be commissioned in 1996 but outfitting was protracted due to problems with weapons-control system integration. Hull and superstructure shaped to reduce radar signature.
Modernizations: mid-2000s, both: - 1 Fennec helicopter; + 1 Super Lynx helicopter
Naval service: No significant events.
Jebat 2013
© Ivan Gogin, 2019