Abukuma 2000
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
あぶくま [Abukuma] | DE229 | Mitsui, Tamano | 17.3.1988 | 21.12.1988 | 12.12.1989 | in service (2019) | |
じんつう [Jintsu] | DE230 | Hitachi, Maizuru | 14.4.1988 | 31.1.1989 | 28.2.1990 | in service (2019) | |
おおよど [Oyodo] | DE231 | Mitsui, Tamano | 8.3.1989 | 19.12.1989 | 23.1.1991 | in service (2019) | |
せんだい [Sendai] | DE232 | Sumitomo, Uraga | 14.4.1989 | 26.1.1990 | 15.3.1991 | in service (2019) | |
ちくま [Chikuma] | DE233 | Hitachi, Maizuru | 14.2.1991 | 22.1.1992 | 24.2.1993 | in service (2019) | |
とね [Tone] | DE234 | Sumitomo, Uraga | 8.2.1991 | 6.12.1991 | 8.2.1993 | in service (2019) |
Displacement standard, t |
2050 |
Displacement full, t |
2550 |
Length, m |
109.0 |
Breadth, m |
13.4 |
Draught, m |
3.80 hull |
No of shafts |
2 |
Machinery |
CODOG: 2 Kawasaki-Rolls-Royce Spey SM-1A gas turbines / 2 Mitsubishi S12U MTK diesels |
Power, h. p. |
27000 / 6000 |
Max speed, kts |
27 |
Fuel, t |
diesel / gas turbine oil |
Endurance, nm(kts) | |
Armament |
2 x 4 Harpoon SSM (8 RGM-84C), 1 x 8 ASROC ASuR (8 RUR-5), 1 x 1 - 76/62 OTO-Melara Compact, 1 x 6 - 20/76 Mk 15 Phalanx, 2 x 3 - 324 HOS-301 TT |
Electronic equipment |
OPS-14C, OPS-28D, FCS-2-21, Mk 90 radars, OQS-8 sonar, NOLQ-6C, OLT-3 ECM suites, 2x SRBOC Mk 36 decoy RL, OYQ-6 CCS |
Complement |
120 |
Project history: A much larger and more capable class of escorts, comparable to the earlier smaller destroyers. Two ordered in successive estimates 1987-80. Fitted for towed-array sonar but never carried.
Modernizations: late 1990s, both, to reduce topweight: - 2 x 2 Harpoon SSM (2 x 2 totally)
2010s, some: - NOLQ-6C ECM suite; + NOLR-8 ECM suite
Naval service: No significant events.
Jintsu 2008
© Ivan Gogin, 2017-19