Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
よど [Yodo] | PC51 | Sumidagawa, Tokyo | 13.3.2001 | 2.10.2001 | 29.3.2002 | in service (2019) | |
ことびき [Kotobiki] | PC52 | Sumidagawa, Tokyo | 3.7.2002 | 23.10.2002 | 27.3.2003 | in service (2019) | |
なち [Nachi], 2015- りゅうおう [Ryuo] | PC53 | Ishihara, Takasago | 3.7.2002 | 29.1.2003 | 27.3.2003 | in service (2019) | |
ぬのびき [Nunobiki] | PC54 | Sumidagawa, Tokyo | 3.7.2002 | 4.12.2002 | 27.3.2003 | in service (2019) | |
ふどう [Fudo] | PC55 | Sumidagawa, Tokyo | 2011 | 29.6.2012 | 21.1.2013 | in service (2019) | |
りゅうせい [Ryusei] | PC56 | Sumidagawa, Tokyo | 2011 | 17.8.2012 | 14.2.2013 | in service (2019) | |
たかたき [Takataki] | PC57 | Niigata SY | 2011 | 8.9.2012 | 15.2.2013 | in service (2019) | |
あおたき [Aotaki] | PC58 | Sumidagawa, Tokyo | 2011 | 2012 | 21.3.2013 | in service (2019) | |
なち [Nachi] | PC59 | Niigata SY | 2011 | 2012 | 29.3.2013 | in service (2019) | |
みのお [Minoo] | PC60 | Nagasaki SY | 2011 | 2012 | 29.3.2013 | in service (2019) |
Displacement standard, t |
125 |
Displacement normal, t |
190 |
Length, m |
35.0 wl 37.0 oa |
Breadth, m |
6.70 |
Draught, m |
1.50 |
No of shafts |
2 |
Machinery |
2 diesels |
Power, h. p. |
5200 |
Max speed, kts |
25 |
Fuel, t |
diesel oil |
Endurance, nm(kts) |
|
Armament |
none |
Electronic equipment |
radar, e/o detector |
Complement |
|
Project history: Principally intended for firefighting and are equipped with firefighting monitors on the bow, atop the pilothouse, and atop the two side-by-side combination mast/stacks.
Modernizations: None.
Naval service: No significant events.
Yodo 2008
© Ivan Gogin, 2017-19