
Cakra 1990
| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
| Cakra | 401 | 135 | Howaldtswerke, Kiel, West Germany | 25.11.1977 | 11.9.1980 | 19.3.1981 | in service (2019) |
| Nanggala (ex-Candrasa) | 402 | 136 | Howaldtswerke, Kiel, West Germany | 14.3.1978 | 11.9.1980 | 6.7.1981 | in service (2019) |
|
Displacement standard, t |
1100 |
|
Displacement normal, t |
1285 / 1390 |
|
Length, m |
59.5 |
|
Breadth, m |
6.20 |
|
Draught, m |
5.50 |
|
No of shafts |
1 |
|
Machinery |
4 MTU12V493AZ 80 diesel generators, 1 Siemens electric motor |
|
Power, h. p. |
2400 / 5000 |
|
Max speed, kts |
11 / 21 |
|
Fuel, t |
diesel oil 87 (108 emergency) |
|
Endurance, nm(kts) |
8200(11) / 400(4) |
|
Armament |
8 - 533 TT (bow, 14) |
|
Electronic equipment |
Calypso II radar, CSU-3-2 sonar suite, DR-2000U ECM suite |
|
Complement |
34 |
|
Diving depth operational, m |
250 |
Project history: German Type 209/1300, ordered 2.4.1977. Carry SUT Mod. 0 torpedoes.
Modernizations: 2006, Cakra; 2012, Nanggala: - CSU-3-2 sonar suite; + Sub-Harpoon SSM (presumably 4 unstead of torpedoes), LOPAS 8300 sonar suite, MSI 90U CCS
Naval service: No significant events.

Nanggala 1999
Many thanks to Wolfgang Stöhr for additional information on this page.
© Ivan Gogin, 2017-19