
Klewang as designed
| Name | No | Yard No | Builder | Laid down | Launched | Comm | Fate |
| Klewang | 625 | Lundin, Banyuwangi | 2005 | 29.8.2012 | --- | fire 28.9.2012 | |
| 626 | Lundin, Banyuwangi | 2016 | 2019 | building (2019) |
|
Displacement standard, t |
|
|
Displacement full, t |
230 |
|
Length, m |
62.5 |
|
Breadth, m |
16.0 |
|
Draught, m |
1.20 |
|
No of shafts |
4 waterjets |
|
Machinery |
4 MAN diesels |
|
Power, h. p. |
7200 |
|
Max speed, kts |
35 |
|
Fuel, t |
diesel oil |
|
Endurance, nm(kts) |
2000 |
|
Armament |
2 x 2 C705 SSM (4 C705), 1 x 7 - 30/77 type 730 |
|
Sensors |
2 radars, SEWACO CCS |
|
Complement |
29 |
Project history: Futuristic design, stealth wave-piercing trimaran carbon composite hull. Klewang was destroyed by fire being outfitted at shipyard 28.9.2012. Also 11m fast X2K design RIB ia carried.
Modernizations: None.
Naval service: No significant events.
© Ivan Gogin, 2017-19