home

fighting ships of the world

INDIAN NAVY (INDIA)

SUBMARINES

CHAKRA nuclear powered submarine (2009/2012)

Chakra 2015

Name No Yard No Builder Laid down Launched Comp Fate
चक्र [Chakra] (ex-Ê-152 Íåðïà [K-152 Nerpa]) S71 518 Amur Yd, Komsomolsk-on-Amur, Russia 1993 30.6.2006 28.10.2009 // 4.4.2012 in service (2019)
 

Displacement standard, t

 

Displacement normal, t

8167 / 10500

Length, m

110.3

Breadth, m

13.8 hull 15.4 max

Draught, m

9.88

No of shafts

1

Machinery

1 OK-9VM geared steam turbines unit, OK-650VM nuclear reactor

Power, h. p.

50000

Max speed, kts

11.2 / 33.3

Fuel, t

nuclear

Endurance, nm(kts)

practically unlimited

Armament

4 - 650 TT (0), 4 - 533 TT (36, inc. Club-S SSM), 1 x 1 Strela-3M SAM (16 9M36)

Electronic equipment

MRKP-59 Radian-U radar, MGK-540 Skat-3 sonar suite, MG-519 Arfa, MG-512 Vint-M sonars, MRP-21A ECM suite, 6 REPS-324 Shlagbaum decoy launchers, MVU-132 Omnibus CCS

Complement

73

Diving depth operational, m

480

Project history: Negotiations with Russia for a 10-year "lease with the option to buy" of a Project 971 nuclear-powered attack submarine have reportedly been under way since at least 1999. Though initially rejected by India, negotiations on the lease of up to two submarines were soon renewed between the two nations due to slippages in development and construction of the Indian ATV program. By late 2005, 300 Indian naval personnel had arrived in Russia to begin training for future service aboard the submarine Nerpa. The program suffered a major setback during November 2008 when the Nerpa was undergoing trials prior to its turnover to India. A fire extinguishing system on board the vessel malfunctioned, killing 20 Russian members of the crew and injuring many others. This placed an indefinite hold on the boat's transfer, which was not finalized until September 2011 with the submarine arriving in Indian waters during October. Submarine was reconstructed under special export project 971I before transfer: 650mm weapon all were landed, but 533mm ammunition stowage was enlarged. Wake detector wasn't installed.

Modernizations: None.

Naval service: In December 2017 Chakra suffered bad damage entering Visakhapatnam harbour and entered dock for repair.

Chakra 2012

© Ivan Gogin, 2018-19