U115
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
U115 | 986 | Schichau, Danzig | 1916 | 1918 | --- | BU on the stocks 1919 | |
U116 | 987 | Schichau, Danzig | 1916 | 1918 | --- | BU on the stocks 1919 |
Displacement standard, t |
|
Displacement normal, t |
882 / 1233 |
Length, m |
72.3 |
Breadth, m |
6.50 |
Draught, m |
4.00 |
No of shafts |
2 |
Machinery |
2 MAN diesels / 2 SSW electric motors |
Power, h. p. |
2400 / 1200 |
Max speed, kts |
16 / 9 |
Fuel, t |
diesel oil 133 |
Endurance, nm(kts) |
11470(8) / 60(4.5) |
Armament |
1 x 1 - 105/42 Utof L/45 C/16, 1 x 1 - 88/27 TK L/30 C/08, 6 - 500 TT (4 bow, 2 ster, 12 - 16) |
Complement |
36 |
Diving depth operational, m |
50 |
Project history: War order K. Double-hulled. They had a diving time of 30 seconds. These 'Project 43" boats were unfinished at the end of war; they were broken up on the slips and the diesels used for merchant ships.
© Ivan Gogin, 2014