Boot 01 with planned armament
Names |
Boot 01, Boot 02 |
Builders |
Aussig / Balatonfüred, Hungary: Boot 01, 02 |
Commissioned |
6/1944: Boot 01 |
Losses |
completed for Czechoslovakia 1947: Boot 02 (DČ-1) |
Transfers |
none |
Discarding |
surrendered 5.1945: Boot 01, BU |
Displacement standard, t |
27.2 |
Displacement full, t |
33.6 |
Length, m |
19.3 |
Breadth, m |
4.26 |
Draught, m |
1.20 |
No of shafts |
2 |
Machinery |
2 BMW VI petrol engines |
Power, h. p. |
1000 |
Max speed, kts |
23.8 |
Fuel, t |
petrol |
Endurance, nm(kts) | |
Armour, mm | turret: 50, deck: 10, belt: 10 |
Armament |
1 x 1 - 37/80 SK C/30, 1 x 3 - 15/84 |
Complement |
23 |
Project history: Armoured motor gunboat, ordered by Army. Intended to serve with bridge teams and landing engineer troops. Boats could be disassembled on three sections (central 19.3x3.0m and two side 16.6x0.6m) and carried by heavy trucks. Planned armament consisted from 1 50mm/42 tank gun in Pz III turret and 1 quadruple 20mm MG.
Modernizations: None.
Naval service: No significant events.
© Ivan Gogin, 2008-14