Names |
Guêpe 1 (Q049) Guêpe 2 (Q050) |
Builders |
Arsenal de Cherbourg: Guêpe 1, 2 |
Commissioned |
none |
Losses |
none |
Transfers |
none |
Discarding |
none |
Displacement standard, t |
|
Displacement normal, t |
45 / 50 |
Length, m |
20.5 |
Breadth, m |
2.10 |
Draught, m |
|
No of shafts |
1 |
Machinery |
1 diesel |
Power, h. p. |
240 |
Max speed, kts |
10.5 / 9 |
Fuel, t |
diesel oil |
Endurance, nm(kts) | 128(10.5) / 80(6) |
Armament |
2 - 450 TC (Drzewiecki drop-collar) |
Complement | 7 |
Diving depth operational, m | 20 |
Project history: Single-hull submarines designed by M Petithomme. Ten planned in the 1904 programme (first 4 have been built in Cherbourg, 3 in Rochefort and last 3 in Toulon), but only first two were ordered on 8 October 1904 and laid down. Construction stopped in March 1908. Numbers Q 51-Q 58, reserved for Guêpe 3 to Guêpe 10, were assigned later lo the Pluviôse class (1905 programme).
Many thanks to Wolfgang Stöhr for additional information on this page.
© Ivan Gogin, 2014