
Clorinde 1917
| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
| Clorinde | Q090 | Arsenal de Rochefort | 11.1910 | 2.10.1913 | 10.1916 | stricken 1.1926 | |
| Cornélie | Q091 | Arsenal de Rochefort | 11.1910 | 29.10.1913 | 9.1917 | stricken 12.1926 |
|
Displacement standard, t |
|
|
Displacement normal, t |
413 / 567 |
|
Length, m |
53.9 |
|
Breadth, m |
5.10 |
|
Draught, m |
3.40 |
|
No of shafts |
2 |
|
Machinery |
2 MAN-Loire diesels / 2 electric motors |
|
Power, h. p. |
800 / 700 |
|
Max speed, kts |
13 / 9 |
|
Fuel, t |
diesel oil |
| Endurance, nm(kts) | 1300(10) / 100(5) |
|
Armament |
8 - 450 TT (6 Drzewiecki drop-collars, 2 fwd ext, 8) |
| Complement | 29 |
| Diving depth operational, m | 40 |
Project history: Double-hulled submarines, built under the 1909 programme. Project of M. Hutter on the basis of Labeuf Brumaire.
Modernizations: 1917, both: + 1 x 1 - 75/35 M1897Naval service: No significant events.

Clorinde
Many thanks to Wolfgang Stöhr for additional information on this page.
© Ivan Gogin, 2008-14