Pohjanmaa 1980
Pohjanmaa 2000
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Pohjanmaa | 01 | 421 | Wärtsilä, Helsinki | 4.5.1978 | 28.8.1978 | 8.6.1979 | stricken 2014 |
Displacement
standard, t 1100 Displacement
full, t Length, m 78.3 Breadth, m 11.6 Draught, m 3.20 No of shafts 2 Machinery 2 Wärtsilä-Vaasa
16V22 diesels Power, h. p. 5800 Max speed, kts 19 Fuel, t diesel oil Armament 1 x 1 - 120/46
Bofors TAK, 2 x 1 - 40/70 Bofors 350, 4 x 2 - 23/87 Sako, 2 x 5 RBU-1200
ASWRL, 2 DCR (12), 120 mines, helicopter deck Complement 80 + 70 cadets Project history: Minelayer and TS. Training
facilities were fitted in portable containers mounted on the two internal mine
rails and were easily removable if the ship was required for combat. Modernizations: 1992: - 2 x 2 - 23/87; + 2 x 1 -
12.7/79 1998: - 1 x 1 - 120/46, nav., 9LV100 radars; + 1 x 1 -
57/70 Bofors SAK-57 Mk 1, 2x Raytheon, Scout, 9LV220 radars
1476
Endurance, nm(kts)
3500(17)
Electronic equipment
nav., DA-05, 9GA208, 9LV100 radars, 2x sonars, ECM suite,
2x Barricade decoy RL
Pohjanmaa 2001
Many thanks to Wolfgang Stoehr for additional information on this page.
© Ivan Gogin, 2019