Names |
10 Tuuli |
Builders |
Aker Finnyards, Rauma: 10 |
Completed |
2002: 10 |
Losses |
none |
Transfers |
none |
Discarding |
2003: 10 |
Displacement standard, t |
|
Displacement full, t |
84 |
Length, m |
27.4 |
Breadth, m |
15.4 |
Draught, m |
// --- |
No of shafts |
2 air propellers |
Machinery |
2 gas turbines for drive and lift |
Power, h. p. |
8046 |
Max speed, kts |
50 |
Fuel, t |
gas turbine oil |
Endurance, nm(kts) |
|
Armament |
torpedoes or mines |
Electronic equipment |
radar |
Complement |
10 |
Project history: Domestic design T2000, designed using technology transfer from the US. Craft can be fitted with ANCS 2000 CCS, Umkhonto SAM and EOMS 2.o multifunction system. New mine (Seamine 2000) was developed for this craft.
Modernizations: None.
Naval service: Tuuli was stricken after less than one year service due to very high service cost.
Tuuli 2002
© Ivan Gogin, 2019