Niels Juel 1980
Niels Juel 2000
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Niels Juel | F354 | Aalborg Værft | 20.10.1976 | 17.2.1978 | 26.8.1980 | stricken 8.2009 | |
Olfert Fischer | F355 | Aalborg Værft | 6.12.1978 | 15.1.1980 | 16.10.1981 | stricken 8.2009 | |
Peter Tordenskiold | F356 | Aalborg Værft | 3.12.1979 | 30.4.1980 | 2.4.1982 | stricken 8.2009 |
Displacement standard, t |
1100 |
Displacement full, t |
1450 |
Length, m |
80.0 pp 84.0 oa |
Breadth, m |
10.3 |
Draught, m |
3.10 hull 4.5 max |
No of shafts |
2 |
Machinery |
CODOG: 1 General Electric LM-2500 gas turbine / 1 MTU 20V956 TB82 diesel |
Power, h. p. |
25000 / 5210 |
Max speed, kts |
30 |
Fuel, t |
diesel / gas turbine oil 130 |
Endurance, nm(kts) |
2500(18) |
Armament |
2 x 4 Harpoon SSM (8 RGM-84A), 1 x 8 NATO-Sea Sparrow SAM (8 RIM-7M), 1 x 1 - 76/62 OTO-Melara Compact, 1 DCR |
Electronic equipment | AWS-5, 2x Scanter Mil 009, 9GR600, 9LV200, 2x Mk 95 radars, PMS-26 sonar, Cutlass B-1 ECM suite, CEPLO CCS |
Complement |
90 |
Project history: An interesting design incorporating equipment from many countries. The planned ASW torpedo system (2 twin 324mm Mk 32 TTs) was never fitted. Ordered 5.12.1975. Usually carried only four Harpoons.
Modernizations: late 1980s, all: + 2x Sea Gnat DL-6T decoy RL
1998, Peter Tordenskiold; 1999, Niels Juel; 2000, Olfer Fischer: - 2 x 4 Harpoon SSM, 1 x 8 NATO Sea Sparrow SAM, AWS-5 radar, 2x Sea Gnat DL-6T decoy RL, CEPLO CCS; + 2 x 4 Harpoon Block II SSM (8 RGM-84F), 2 x 6 Sea Sparrow SAM (VLS, 12 RIM-7P) (usually only 6 silos with 6 missiles), TRS-3D16 radar, 2x Sea Gnat DL-12T decoy RL, 9LV Mk 3 CCS
2002-2004, all: - 2 x 6 Sea Sparrow SAM; + 2 x 12 ESSM SAM (VLS, 24 RIM-162A), 2 x 2 Stinger SAM (16 FIM-92)
Naval service: No significant events.
Niels Juel 2002
© Ivan Gogin, 2019