Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Olaya Herrera, 1997- TECIM Jaime E. Cárdenas Gómez | AN21, 1997- GC115, 1999- PM115 | Swiftships, Berwick, USA | 16.10.1981 | in service (2019) | |||
C. N. Rafael del Castillo y Rada | GC102, 1999- PM102 | Swiftships, Berwick, USA | 28.2.1983 | in service (2019) |
Displacement
standard, t Displacement
full, t 103 Length, m 29.2 pp 32.0
oa Breadth, m 6.69 Draught, m 2.14 No of shafts 4 Machinery 4 MTU 12V331
TC92 diesels Power, h. p. 7000 Max speed, kts 25 Fuel, t diesel oil Armament 1 x 1 - 40/60
Mk 3, 2 x 1 - 12.7/90 Complement
Endurance, nm(kts)
2400(15)
Electronic equipment
Raytheon radar, COAR e/o system
19
Project history: US Swiftships 105ft Commercial Cruiser class.
Modernizations: None.
Naval service: Olaya Herrera was paid off but returned unarmed as part of Customs service and later transferred back to the Coast Guard.
Rafael del Castillo y Rada 1999
© Ivan Gogin, 2019