PEOPLE`S LIBERATION ARMY NAVY (PEOPLE`S REPUBLIC OF CHINA)
Changcheng 201 1955
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
长城 200 [Changcheng 200] (ex-M-44, ex-M-84) | 200 | 196 Yd (Sudomekh Wks), Leningrad, USSR | 3.1934 | 15.7.1935 | 11.1935 // 1954 | commissioned as TS, deleted 1963 | |
长城 201 [Changcheng 201] (ex-M-77) | 201 | 198 Yd (Marti Yd), Nikolayev, USSR | 3.1934 | 21.3.1936 | 6.1936 // 1954 | commissioned as TS, deleted 1963 | |
长城 202 [Changcheng 202] (ex-M-78) | 202 | 198 Yd (Marti Yd), Nikolayev, USSR | 3.1934 | 21.3.1936 | 6.1936 // 1954 | commissioned as TS, deleted 1963 | |
长城 203 [Changcheng 203] (ex-M-47, ex-M-53) | 203 | 198 Yd (Marti Yd), Nikolayev, USSR | 2.1934 | 23.12.1934 | 6.1935 // 1954 | commissioned as TS, deleted 1963 | |
长城 204 [Changcheng 204] (ex-M-48, ex-M-56) | 204 | 200 Yd (61 Kommunar Yd), Nikolayev, USSR | 3.1935 | 20.11.1935 | 10.1936 // 1954 | commissioned as TS, deleted 1963 | |
长城 205 [Changcheng 205] (ex-M-43, ex-M-82) | 205 | 196 Yd (Sudomekh Wks), Leningrad, USSR | 2.1934 | 10.6.1935 | 11.1935 // 1954 | commissioned as TS, deleted 1963 |
Displacement standard, t |
|
Displacement normal, t |
161 / 202 |
Length, m |
37.8 |
Breadth, m |
3.11 |
Draught, m |
2.58 |
No of shafts |
1 |
Machinery |
1 38B8 diesel / 1 PG60/34 electric motor |
Power, h. p. |
685 / 240 |
Max speed, kts |
13.2 / 7.2 |
Fuel, t |
diesel oil 13 |
Endurance, nm(kts) | 1065(10) / 55(2.5) |
Armament |
1 x 1 - 45/46 21K, 2 - 533 TT (bow, 2) |
Electronic equipment | Mars-8 hydrophone |
Complement |
17 |
Diving depth operational, m |
50 |
Project history: Former Soviet M VI-bis series coastal submarines.
Modernizations: None.
Naval service: All were transferred in time of transfer of Port Arthur naval base from Soviet Union to China and were used in training roles (presumably as harbour boats).
© Ivan Gogin, 2015