PEOPLE`S LIBERATION ARMY NAVY (PEOPLE`S REPUBLIC OF CHINA)
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
18 | Jiangnan, Shanghai | 12.2017 | 2020 | 2021 | building (2019) |
Displacement standard, t |
60000 |
Displacement full, t |
80000 |
Length, m |
320.0 |
Breadth, m |
80.0 |
Draught, m |
12.0 max |
No of shafts |
4 |
Machinery |
4 geared steam turbines, 8 boilers |
Power, h. p. |
160000 |
Max speed, kts |
30 |
Fuel, t |
oil |
Endurance, nm(kts) |
14000(16) |
Armament |
4 x 24 HQ-9 SAM (VLS, 96 HQ-9), 4 x 11 - 30/80 type 1130, 44 aircraft (J-15 fighters, Z-18F, Z-18J, Z-9C helicopters) |
Electronic equipment |
type 346, 3x type 347G radars, ECM suite, 4 24-tubes and 2 16-tubes decoy launchers, CCS |
Complement |
4000-5000 |
Aircraft facilities (fd - ? m², ha - ? m² / ? m³): Flight deck: 320.0 x 80.0m. Hangar: m. There are 2 deck-edge elevators (40t, 20 x 15m) and 3 - 4 90m electro-magnetic catapults. Aircraft fuel stowage: jet fuel.
Year | fighters | helicopters |
as planned | 40 J-15, 10 J-18, 6 KJ-600 | 4 Z-18F, 2 Z-20 |
Project history: Type 002 with EMALS instead of ski-jump and reduced by 25% superstructure.
© Ivan Gogin, 2017-19