Ceará 2000
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
Ceará (ex-Hermitage) | G30 | Ingalls, Pascagoula, USA | 11.4.1955 | 12.6.1956 | 14.12.1956 // 2.10.1989 | stricken 4.2016 | |
Rio de Janeiro (ex-Alamo) | G31 | Ingalls, Pascagoula, USA | 11.10.1954 | 20.1.1956 | 24.8.1956 // 18.1.1991 | stricken 6.2012 |
Displacement standard, t |
6880 |
Displacement full, t |
12150 |
Length, m |
155.5 |
Breadth, m |
25.6 |
Draught, m |
5.80 |
No of shafts |
2 |
Machinery |
2 sets General Electric geared steam turbines, 2 Babcock & Wilcox boilers |
Power, h. p. |
24000 |
Max speed, kts |
22.5 |
Fuel, t |
oil 1390 |
Endurance, nm(kts) |
10000(20) |
Armament |
3 x 2 - 76/50 Mk 33, 4 x 1 - 12.7/90, helicopter deck |
Military load |
340 troops, 2 LCU or 18 LCM(6) or 6 LCM(8) or 80 LVT, 2 LCVP, 2 LCPL, 7400 t cargo |
Electronic equipment |
Furuno M1942, SPS-10F radars |
Complement |
335 |
Project history: Former USN Thomaston class. The 119.2x14.6m well deck accommodated three LCU or nine LCM-8 or fifty LVT. The helicopter deck was removable and there were no maintenance facilities; two 50t cranes can reach down to a mezzanine (vehicle stowage) or the well deck. Bows were strengthened for ice navigation, and the last two units were air conditioned.
Modernizations: 2004, Ceará: + AWS-2, CRP3100 radars
2004, Rio de Janeiro: + AWS-4 radar
Naval service: No significant events.
Ceará 2007
© Ivan Gogin, 2018