AB2000 landing craft (2003-2005)
| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
| AB2000 | ADI, Newcastle | 12/2003 | stricken 2011 | ||||
| AB2001 | ADI, Newcastle | 2004 | stricken 2011 | ||||
| AB2002 | ADI, Newcastle | 2004 | stricken 2011 | ||||
| AB2003 | ADI, Newcastle | 2004 | stricken 2011 | ||||
| AB2004 | ADI, Newcastle | 2005 | stricken 2011 | ||||
| AB2005 | ADI, Newcastle | 4/2005 | stricken 2011 |
|
Displacement standard, t |
60 |
|
Displacement full, t |
131 |
|
Length, m |
25.4 |
|
Breadth, m |
7.60 |
|
Draught, m |
1.00 |
|
No of shafts |
2 waterjets |
|
Machinery |
2 Detroit 6062 diesels |
|
Power, h. p. |
|
|
Max speed, kts |
14 |
|
Fuel, t |
diesel oil |
|
Endurance, nm(kts) |
720(10) |
|
Armament |
2 x 1 - 12.7/90 |
|
Military load |
5 13t vehicles (65 t cargo) |
| Electronic equipment | radar |
|
Complement |
5 |
Project history: Ordered in 2002 for use with Kanimbla and Manoora with two on each. Aluminium construction. Bow and stern ramps. Movable by 70t cranes.
Modernizations: None.
Naval service: No significant events.

AB2000 2004
© Ivan Gogin, 2017