Kalaat Beni Abbes 2015
Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
كلات بني عبس [Kalaat Beni Abbes] | 474 | Fincantieri, Muggiano, Italy | 2012 | 14.1.2014 | 4.9.2014 | in service (2019) |
Displacement standard, t |
|
Displacement full, t |
8800 |
Length, m |
142.9 |
Breadth, m |
21.5 |
Draught, m |
4.90 |
No of shafts |
2 |
Machinery |
2 Wärtsilä 12V32 diesels |
Power, h. p. |
16320 |
Max speed, kts |
20 |
Fuel, t |
diesel oil |
Endurance, nm(kts) |
7000(14) |
Armament |
2 x 8 Sylver 50 SAM (VLS, 16 Aster 15), 1 x 1 - 76/62 OTO-Melara Compact SR, 2 x 1 - 25/80 KBA, 5 helicopters (AW-101 Merlin) |
Military load | 3 LCM, 3 LCVP, 1 LCPL, 15 armoured vehicles, 440 troops |
Electronic equipment |
EMPAR, NA-25, nav. radars, 2x SCLAR-H decoy RL, Athena C CCS |
Complement |
150 |
Project history: Ordered in 2011 by BDSL programme (Bâtiment de débarquement et de soutien logistique). Enlarged version of Italian San Giusto. Has 2 landing spots for helicopters, hangar for 5 helicopters and 30t aircraft elevator. 20.5m long 7m high well-deck can accommodate 3 LCMs. Building of the second ship is an option.
Modernizations: None.
Naval service: No significant events.
© Ivan Gogin, 2019